Motorsport composite engineering · North America & UK / Europerfq@racecomposites.com

Methodology

Engineering formulas & cost benchmark methodology

Every number the estimators produce comes from the formulas and rates on this page. Use it to check our math, adapt it to your own shop rates, or see exactly what a quote will refine.

Benchmark rates

ItemBenchmark rangeValue used
Composite shop blended labor$75 – $150+/h$105/h
Laminators (burdened)$30 – $65/hIn blended rate
Autoclave / QC technicians$40 – $75/hIn blended rate
Composite engineers / CAM$65 – $110+/hIn CAD/CAM setup
5-axis CNC trimming (PCD, dust extraction)$100 – $250/machine h$165/h
Autoclave cure cycle (3–7 bar, 120–180 °C)$250 – $1,500+/vessel run$350 + $400 × area, max $1,250
OOA oven cycle—$160 + $100 × area, max $380
VARTM cure / post-cure—$90 + $60 × area, max $220
Structural film adhesive$15 – $35/m² per bond line$20 (150 gsm) / $30 (250 gsm)

Tooling estimator

Inputs: surface area A (m²), geometry factor g (open 1.0, compound 1.35, split 1.85, bladder 2.25), tool factor k (epoxy/glass 0.65, carbon 1.0, direct aluminum 2.1), quantity n.

Upfront tooling (NRE)

Pattern = (700 + 3,800 · A^1.05) · g (0 for direct aluminum) Setup = min(2,400, 600 + 700 · A · g) (CAD/CAM programming) Mold = (1,200 + 7,500 · A^1.1) · g · k Fixture = 650 + 450 · A · g (only with CNC trim) NRE = Pattern + Setup + Mold + Fixture (× 1.2 race-urgent)

The constants are fitted so a 0.25 m² open part lands in the $2,000–$6,000 small-part band, a 0.85 m² compound wing element in the $6,000–$20,000 band and a 1.5–2.2 m² compound or split part in the $20,000–$70,000+ band.

Recurring cost per part

Material = (plies · rate + core + film) · A · (1 + scrap) scrap = 0.30 prepreg nesting, 0.20 dry VARTM; VARTM uses dry-fabric rates and no film Consumables = VARTM min(160, 65 + 50·A); prepreg min(110, 45 + 30·A) Layup hours = (2 + 4.5·A) · g · p · m; p: VARTM 1.15, OOA 1.0, autoclave 1.05; m: monolithic 1.0, sandwich 1.25, M40J 1.35 Layup = hours · $105 Cure = cycle cost / parts per run; parts per run = max(1, min(n, ⌊2.5 / A⌋)) Trim = manual (0.5 + 0.6·A) h · $105, or CNC (0.6 + 0.9·A) · √g h · $165 + inserts ($60 + $40·A) + 1 h bonding; clear coat + min(750, 280 + 210·A) Inspection = visual 0.4 h · $105, or CMM FAI + NDT min(950, 250 + 320·A) Race-urgent = layup, trim and inspection × 1.25
StackPliesPrepreg $/m²/plyDry $/m²/plyCore $/m²Film $/m²
Monolithic T300 3K6$45$28——
T700 + 10 mm Nomex4$70$40$90$50
T800 + 10 mm Rohacell 514$125$75$115$50
M40J + Rohacell 716$220$130$150$50

Totals and lead time

Program total = NRE + recurring · n shown as ±12% Amortized = Program total / n Tooling weeks = 1.5 + 0.55 · A · g (1.5–6); aluminum 1.5 + 0.5 · A · g (1.5–5) First article = 3 / 4 / 5 days (VARTM / OOA / autoclave) + 1–2 days for complex geometry Batch weeks = ((n − 1) · layup hours / 8 / 2 crews + ⌈(n − 1) / per run⌉ · 0.5) / 5 Race-urgent ≈ 50% of standard elapsed time

Laminate calculator

Skin thickness t_f = plies · t_ply Panel thickness T = t_c + 2 · t_f Areal weight W = 2 · plies · gsm_prepreg / 1000 + ρ_c · t_c + 2 · gsm_film / 1000 [kg/m²] Panel mass M = W · L · B Flexural rigidity D = E_f · t_f · (t_c + t_f)² / (2 · (1 − μ²)) sandwich D = E_f · (2 t_f)³ / (12 · (1 − μ²)) monolithic, μ = 0.12 Load F = load_kgf · 9.81 N, uniformly distributed over span L_s, width b Bending deflection δ_b = 5 · F · L_s³ / (384 · D · b) Core shear δ_s = F · L_s / (8 · G_c · (t_c + t_f) · b) Total δ = δ_b + δ_s
Face sheetPrepreg gsmEf (laminate)tply$/m²/ply
T300 3K 2x2 twill 200 gsm32058 GPa0.21 mm$45
T700 2x2 twill 200 gsm32065 GPa0.21 mm$70
T700 UD 150 gsm235125 GPa0.15 mm$65
T800 IM UD 150 gsm235155 GPa0.15 mm$125
M40J HM UD 150 gsm235220 GPa0.15 mm$220
Carbon-Kevlar hybrid twill 200 gsm33042 GPa0.23 mm$60

Equal-stiffness comparison plates solve D = E·t³ / (12(1 − ν²)) for thickness: 6061-T6 aluminum E 68.9 GPa, ν 0.33, ρ 2,700 kg/m³; birch plywood E 9.5 GPa, ν 0.3, ρ 680 kg/m³. Core cost scales linearly from its 10 mm price.

Engineering disclaimer. These are pre-RFQ estimates for comparison and budgeting. They do not replace laminate analysis, testing or a quotation. Prices vary with region, material lot, exchange rates and shop capacity. Structural and safety-critical parts must be designed and approved by a qualified engineer to the applicable regulations.

Use the formulas live: tooling & production cost estimator · sandwich laminate calculator · about Race Composites.

Submit an engineering RFQ

Send what you have. We return a DFM review and a production plan.

  • CAD or sample STEP / IGES, a 3D scan, or the physical part to reverse-engineer
  • Spec intent process, fiber grade, core and resin Tg (or let us recommend)
  • Quantity one-off, spares set or season batch
  • Race deadline the event or test date the part must make
Submit engineering RFQ

Or email rfq@racecomposites.com. DFM and capacity check within 1–2 business days.