Estimator 01

Motorsport composite tooling & production cost estimator

Choose the part, geometry, cure route, tooling and stack. The estimate splits upfront tooling (NRE) from recurring cost per part, amortizes across the batch and compares VARTM, OOA and autoclave prepreg for the same part.

Part & process inputs

Component preset
0.85 m²
Mold surface of one part, one side. Presets fill typical values.
Geometry complexity
Manufacturing process
5 parts
Post-processing & finish
Inspection
Schedule

Batch amortization

QuantityTooling NRERecurring / partProgram totalAmortized / part

Same part, three processes

ProcessProgram totalAmortized / partExpected VfVoid riskLead time
Autoclave rows switch an epoxy/glass tool to a carbon tool; VARTM rows switch honeycomb to foam core, as a shop would.

Cost breakdown

LineTypeCost

What this is. A pre-RFQ budget from published motorsport composite benchmarks (tooling bands, prepreg $/m², $75–$150/h shop labor, $100–$250/h 5-axis CNC, $250–$1,500 autoclave cycles). A quote follows CAD, ply-book and capacity review. Every formula and rate is on the methodology page. To size the laminate itself, use the sandwich laminate calculator; for tooling choices read composite tooling & molds and autoclave vs OOA vs VARTM.

Submit an engineering RFQ

Send what you have. We return a DFM review and a production plan.

  • CAD or sample STEP / IGES, a 3D scan, or the physical part to reverse-engineer
  • Spec intent process, fiber grade, core and resin Tg (or let us recommend)
  • Quantity one-off, spares set or season batch
  • Race deadline the event or test date the part must make
Submit engineering RFQ

Or email rfq@racecomposites.com. DFM and capacity check within 1–2 business days.