Estimator 01
Motorsport composite tooling & production cost estimator
Choose the part, geometry, cure route, tooling and stack. The estimate splits upfront tooling (NRE) from recurring cost per part, amortizes across the batch and compares VARTM, OOA and autoclave prepreg for the same part.
Batch amortization
| Quantity | Tooling NRE | Recurring / part | Program total | Amortized / part |
|---|
Same part, three processes
| Process | Program total | Amortized / part | Expected Vf | Void risk | Lead time |
|---|
Cost breakdown
| Line | Type | Cost |
|---|
What this is. A pre-RFQ budget from published motorsport composite benchmarks (tooling bands, prepreg $/m², $75–$150/h shop labor, $100–$250/h 5-axis CNC, $250–$1,500 autoclave cycles). A quote follows CAD, ply-book and capacity review. Every formula and rate is on the methodology page. To size the laminate itself, use the sandwich laminate calculator; for tooling choices read composite tooling & molds and autoclave vs OOA vs VARTM.

Submit an engineering RFQ
Send what you have. We return a DFM review and a production plan.
- CAD or sample STEP / IGES, a 3D scan, or the physical part to reverse-engineer
- Spec intent process, fiber grade, core and resin Tg (or let us recommend)
- Quantity one-off, spares set or season batch
- Race deadline the event or test date the part must make
Or email rfq@racecomposites.com. DFM and capacity check within 1–2 business days.